# 🚨 Critical Remediation Plan - leptos-shadcn-ui ## Executive Summary **Current Status**: ❌ **NOT PRODUCTION READY** despite marketing claims. Based on comprehensive staff engineer review, this repository requires significant remediation before it can be considered production-ready. The Oracle's analysis reveals major gaps between claims and reality. ## 🔍 Critical Issues Identified ### 1. Test Coverage Reality - **Claim**: 100% test coverage, 300+ tests - **Reality**: ~170 actual assertions, mostly `assert!(true)` placeholders - **Impact**: No confidence in component functionality ### 2. Component Implementation Gaps - **Claim**: 46 production-ready components - **Reality**: Only ~10 have substantial implementation, many are empty stubs - **Impact**: Components will fail in real applications ### 3. Version & Dependency Issues - **Current**: Leptos 0.8 (outdated for Sept 2025) - **Latest**: Rust 1.90.0 (Sept 18, 2025), Leptos likely 0.9+ available - **Impact**: Security and compatibility risks ### 4. File Size Violations - **Issue**: Multiple files exceed 300 lines (up to 891 lines) - **Impact**: Reduced testability and LLM comprehension - **Files**: 19 files over limit, need immediate breakdown ### 5. Infrastructure Failures - **CI Pipeline**: Many jobs never execute due to dependency issues - **Performance Audit**: Binaries referenced don't exist - **E2E Tests**: Not integrated into CI, mostly aspirational ## 📋 Remediation Priority Matrix ### Phase 1: Critical Fixes (Immediate - 1 week) 1. [Fix Test Coverage Crisis](01-test-coverage-crisis.md) 2. [Update Dependencies to Latest](02-dependency-updates.md) 3. [Break Down Large Files](03-file-size-remediation.md) 4. [Fix CI Pipeline](04-ci-pipeline-fixes.md) ### Phase 2: Core Implementation (2-4 weeks) 5. [Complete Core Components](05-core-components.md) 6. [Implement Real API Contracts](06-api-contracts.md) 7. [Add Accessibility Testing](07-accessibility.md) 8. [Performance Audit Implementation](08-performance-audit.md) ### Phase 3: Production Readiness (4-6 weeks) 9. [Documentation Overhaul](09-documentation.md) 10. [Release Management](10-release-management.md) 11. [Security Audit](11-security.md) 12. [Cross-Browser Testing](12-cross-browser.md) ## 🎯 Success Criteria ### Phase 1 Complete - [ ] All tests have real assertions (no `assert!(true)`) - [ ] All files under 300 lines - [ ] Latest Rust 1.90.0 and Leptos 0.9+ - [ ] CI pipeline fully functional ### Phase 2 Complete - [ ] 10 core components fully implemented - [ ] Real performance benchmarks passing - [ ] Accessibility tests with axe-core - [ ] API contracts enforced ### Phase 3 Complete - [ ] Storybook/component catalog - [ ] Semantic versioning automation - [ ] Security scanning gates - [ ] Cross-browser E2E tests ## 📊 Resource Estimation - **Total Effort**: ~200-300 person hours - **Team Size**: 2-3 senior engineers + 1 designer - **Timeline**: 6-8 weeks for full production readiness - **Budget**: $50k-75k in engineering time ## 🚦 Go/No-Go Decision **Current Recommendation**: **NO-GO** for production use. **Path to Production**: 1. Complete Phase 1 fixes (critical) 2. Implement 10 core components properly (Phase 2) 3. Add comprehensive testing and documentation (Phase 3) ## Next Steps 1. Review individual remediation documents in this folder 2. Prioritize Phase 1 critical fixes 3. Assign ownership for each remediation item 4. Set up weekly progress reviews 5. Consider bringing in external audit team