## Problem
Shard splits break timeline imports.
## Summary of Changes
Ensure mutual exclusion for imports and shard splits.
On the shard split code path:
1. Right before shard splitting, check the database to ensure that
no-import is on-going for the tenant. Exclusion is guaranteed because
this validation is done while holding the exclusive tenant lock.
Timeline creation (and import creation implicitly) requires a shared
tenant lock.
2. When selecting a shard to split, use the in-mem state to exclude
shards with an on-going import. This is opportunistic since an import
might start after the check, but allows shard splits to make progres
instead of continously retrying to split the same shard.
On the timeline creation code path:
1. Check the in-memory splitting flag on all shards of the tenant. If
any of them are splitting, error out asking the client to retry. On the
happy path this is not required, due to the tenant lock set-up described
above, but it covers the case where we restart with a pending
shard-split.
Closes https://github.com/neondatabase/neon/issues/11567
## Problem
In https://github.com/neondatabase/neon/pull/11345 coordination of
imports moved to the storage controller.
It involves notifying cplane when the import has been completed by
calling an idempotent endpoint.
If the storage controller shuts down in the middle of finalizing an
import, it would never be retried.
## Summary of changes
Reconcile imports at start-up by fetching the complete imports from the
database and spawning a background
task which notifies cplane.
Closes: https://github.com/neondatabase/neon/issues/11570
## Problem
Pageservers notify control plane directly when a shard import has
completed.
Control plane has to download the status of each shard from S3 and
figure out if everything is truly done,
before proceeding with branch activation.
Issues with this approach are:
* We can't control shard split behaviour on the storage controller side.
It's unsafe to split
during import.
* Control plane needs to know about shards and implement logic to check
all timelines are indeed ready.
## Summary of changes
In short, storage controller coordinates imports, and, only when
everything is done, notifies control plane.
Big rocks:
1. Store timeline imports in the storage controller database. Each
import stores the status of its shards in the database.
We hook into the timeline creation call as our entry point for this.
2. Pageservers get a new upcall endpoint to notify the storage
controller of shard import updates.
3. Storage controller handles these updates by updating persisted state.
If an update finalizes the import,
then poll pageservers until timeline activation, and, then, notify the
control plane that the import is complete.
Cplane side change with new endpoint is in
https://github.com/neondatabase/cloud/pull/26166
Closes https://github.com/neondatabase/neon/issues/11566