Files
neon/pageserver
Christian Schwarz cfc0fb573d pageserver: run all Rust tests with remote storage enabled (#5164)
For
[#5086](https://github.com/neondatabase/neon/pull/5086#issuecomment-1701331777)
we will require remote storage to be configured in pageserver.

This PR enables `localfs`-based storage for all Rust unit tests.

Changes:

- In `TenantHarness`, set up localfs remote storage for the tenant.
- `create_test_timeline` should mimic what real timeline creation does,
and real timeline creation waits for the timeline to reach remote
storage. With this PR, `create_test_timeline` now does that as well.
- All the places that create the harness tenant twice need to shut down
the tenant before the re-create through a second call to `try_load` or
`load`.
- Without shutting down, upload tasks initiated by/through the first
incarnation of the harness tenant might still be ongoing when the second
incarnation of the harness tenant is `try_load`/`load`ed. That doesn't
make sense in the tests that do that, they generally try to set up a
scenario similar to pageserver stop & start.
- There was one test that recreates a timeline, not the tenant. For that
case, I needed to create a `Timeline::shutdown` method. It's a
refactoring of the existing `Tenant::shutdown` method.
- The remote_timeline_client tests previously set up their own
`GenericRemoteStorage` and `RemoteTimelineClient`. Now they re-use the
one that's pre-created by the TenantHarness. Some adjustments to the
assertions were needed because the assertions now need to account for
the initial image layer that's created by `create_test_timeline` to be
present.
2023-09-01 18:10:40 +02:00
..