* wip: connect fails for hosts the managed server can't serve; remove relay session, deploy and relay UI
* wip: delete relay-only client modules left unreachable, prune their tests and gates
* wip: format
* wip: exhaustive unserved message
* wip: drop relay attestation test for the deleted ownership proof
* fix: prune stale baselines; type the test transport stub
* fix(ssh): census proves leftover relay leases; name the remedy for older terminals; translate every connect-failure surface
* test(ssh): leftover leases defer to the host census
* test(e2e): remove relay-path SSH e2e specs and their CI lanes
* test(e2e): drop the auto-convert case that built its relay era through a live relay
* test(e2e): mark relay-era browser and catalog journeys fixme until they seed a profile
* test(e2e): seed relay-era browser and catalog journeys from a saved profile
The three journeys built their old-version state through a connect without an orcad template, which now refuses the host. They now start from a seeded relay-era profile, so the first connect converts the host as an upgrading user's would.
* chore(ci): drop shard timings for the deleted relay tests
* test(e2e): carry a relay-era login cookie across the browser conversion; own every launch
* test(ci): drop the deleted SSH layout oracle from its route
* test(e2e): open the retained browser after conversion, retrying a pre-connect card
* test(e2e): bind the relay-era browser partition before seeding its cookie
A relay-era build always recorded the partition binding before a page stored
data in it. Seeding the cookie into an unbound partition made the binding store
refuse it (browser_route_partition_binding_store_invalid), so the retained tab
showed the generic routing card and Retry could never clear it.
Co-Authored-By: Claude <noreply@anthropic.com>
---------
Co-authored-by: m4air <m4air@Mac.localdomain>
Co-authored-by: Claude <noreply@anthropic.com>
* Reduce repeated PR setup and transcript timing waits; add hosted comparisons
* Align parallelism contract with Node-only external rebuild toolchain
* Record hosted coverage and launch package, store, and cancellation comparisons
* Apply hosted Windows setup savings and remove measured test waits
* Keep measured PR package gains and remove completed comparison jobs
* Report measured test counts with precise units
A change to the SSH workspace browser route, its gate card, or the host-connection
phase it waits on selected no e2e specs, so the Docker SSH browser spec never ran
on the PR that changed it.