Relay region correction — implementation checklist
Scope: idle-only correction. Superseded retention history is preserved in
.tmp/idle-cutover-review/checklist-history-before-final.mdand the backup branch. Follow idle-cutover plan.
Idle-only implementation tracker
- Resolve plan review findings and obtain Astra approval (revision 2).
- Preserve pre-rescope revision on
relay-region-before-idle-implementation. - Endpoint authentication and incarnation check: deterministic red/green.
- Worker selects before cutover; busy deferral and lost reply tests: red/green.
- Source barrier covers accepts, attaches, commands and control replacement (48 registry tests, including conflicting operation-ID authority tuples; red/green evidence in acceptance).
- Constrained assignment commit and locked ambiguous-outcome reconciliation (11 PostgreSQL 16 tests on 55440, including both replacement orders and a lost commit reply).
- Desktop removes live-retention handling, retains fresh decisions and fallback (53 focused desktop/compatibility tests; node typecheck passes).
- Remove superseded cloud retention protocol/store/cleanup and obsolete tests. The legacy database capability column remains written as0 for existing schema compatibility; it enables no behavior.
- Real two-cell transport: two clients, quiet connection, idle move, arrival race, and observed target-registration failure with ordinary recovery (3 tests pass).
- Focused PostgreSQL transaction/concurrency checks on 55440 (11 passed).
- Full local relevant cloud/desktop suites: 682 cloud tests with PostgreSQL,177 desktop relay tests,16 transport/compatibility tests.
- Local pinned-wire compatibility, Docker SSH/folder continuity (7), types, lint and reliability manifest. Packaged/device/platform gates remain open.
- Fifth Astra low implementation audit: APPROVE within the documented scope.
- Rewrite and validate cloud/desktop PRs, CI and final acceptance evidence.
These are merge-readiness tasks. Device/package/platform and production rollout requirements remain explicit gaps until independently evidenced.
Current transport disposition: the replacement idle-only transport suite is green (3 tests), but the PRs are not ready. Local cloud/desktop verification, final implementation audit, SSH/folder evidence and reliability docs are complete. PR updates, fresh CI and release evidence remain. The full cloud suite passes682 tests with PostgreSQL16 and no skips; cloud typecheck passes. Final audit and remaining end-to-end/PR tasks are still open. Exact commands/results are at the top of the acceptance document. The original live-retention rollback assertion is superseded by the approved product rescope; these results do not claim that old design was repaired.
Publication and release gates
- Prepare separate cloud/desktop patches and concrete PR descriptions locally.
- Reproduce and address old CI failures: fetch audit count and cloud test dependencies.
- Obtain authorization to publish under the original no-push handoff constraint.
- Update cloud draft20037 and desktop draft20031; verify exact-head CI.
- Packaged mixed-version desktop/mobile and physical-device lifecycle.
- Linux/Windows transport evidence, CI soak, bounded rollout and measured benefit.
No production mutation or deployment occurred. Local passing tests and audit approval are not a claim that the current published PRs are ready or the feature is deployed. The acceptance document lists commands, evidence scope and remaining gaps.