mirror of
https://github.com/stablyai/orca.git
synced 2026-10-07 16:02:29 +00:00
* fix(relay): commit the cell counter in one round trip; cells boot without the DB Step 2 (option B) cell image: - One-round-trip counter commit at acquireActivity, releaseActivity and activateControl: the final counter UPDATE and COMMIT go as one simple-query message. Server errors mean COMMIT never ran (retry as today; 22012 = no row, rolled back and disambiguated outside the transaction); a lost connection is never retried. - Cells skip the schema apply and region backfill, so they listen while the database is down and turn ready on their first successful query. - G13: rehome target connection headroom folded into the existing NOWAIT UPDATE, excluding the host's own reservation by key. - fixLevel on every runtime metrics line, plus declared (not applied) cell fix-level metrics and alert. - Per-desktop drain disconnect-gap measurement from existing log lines. - Census test that fails on floating database promises; fixes two shutdown sites. Lock-wait sample keeps the combined role. * fix(relay): make the outdated-image alert creatable: one PromQL condition, 1 h lookback, fixed floor A PromQL condition must be the only condition in its policy, and alerts on log-based metrics may look back at most 25 h. Replace the 6-day/7-day design with relay_cell_min_fix_level (tfvars, raised by a targeted apply after each wave) and one query: a serving cell below the floor or reporting no level, sustained 6 h. Drops the separate without-level metric. * fix(relay): review fixes: gap-script ordering, wider promise census, fused-path guard, row-busy as scheduled - Drain gap script: sort closes by time (gcloud exports newest first) and refuse an invalid drain start. - Census: any floating promise in relay src, including callback-discarded and never-read ones, with a reviewed never-rejects list. - Test the fused counter commit through the store the server builds, so a wrapper that stops forwarding commitWithFinal fails CI. - Same-cap shadow gate: a row-busy refusal (the host's own release still holds its row) is a scheduled 503, like an own early retry. No client change. * test(relay): judge drain redials by no host refused twice, not a refusal count The row-busy count tracks how many releases are still in flight at the dial (80 of 180 every run at 1 s, against a bar of 90). What matters is that the release has finished by the next dial: assert no host is refused twice, keep the time-to-placed p95 bound. * fix(relay): cap row-busy as scheduled at the drain-return admissions; bound the gap script's window Shadow gate: a row-busy refusal of a drained host follows its drain-return lane admission, so per minute only that many (plus a rounding margin of 2) are scheduled; the rest stay non-drain, so row contention the drain does not explain still fails the budget. Gap script: --drain-ended-at excludes the new container's closes after the roll; later grants still close a gap.