🚨 Critical Remediation Plan - leptos-shadcn-ui
Executive Summary
Current Status: ❌ NOT PRODUCTION READY despite marketing claims.
Based on comprehensive staff engineer review, this repository requires significant remediation before it can be considered production-ready. The Oracle's analysis reveals major gaps between claims and reality.
🔍 Critical Issues Identified
1. Test Coverage Reality
- Claim: 100% test coverage, 300+ tests
- Reality: ~170 actual assertions, mostly
assert!(true)placeholders - Impact: No confidence in component functionality
2. Component Implementation Gaps
- Claim: 46 production-ready components
- Reality: Only ~10 have substantial implementation, many are empty stubs
- Impact: Components will fail in real applications
3. Version & Dependency Issues
- Current: Leptos 0.8 (outdated for Sept 2025)
- Latest: Rust 1.90.0 (Sept 18, 2025), Leptos likely 0.9+ available
- Impact: Security and compatibility risks
4. File Size Violations
- Issue: Multiple files exceed 300 lines (up to 891 lines)
- Impact: Reduced testability and LLM comprehension
- Files: 19 files over limit, need immediate breakdown
5. Infrastructure Failures
- CI Pipeline: Many jobs never execute due to dependency issues
- Performance Audit: Binaries referenced don't exist
- E2E Tests: Not integrated into CI, mostly aspirational
📋 Remediation Priority Matrix
Phase 1: Critical Fixes (Immediate - 1 week)
Phase 2: Core Implementation (2-4 weeks)
- Complete Core Components
- Implement Real API Contracts
- Add Accessibility Testing
- Performance Audit Implementation
Phase 3: Production Readiness (4-6 weeks)
🎯 Success Criteria
Phase 1 Complete
- All tests have real assertions (no
assert!(true)) - All files under 300 lines
- Latest Rust 1.90.0 and Leptos 0.9+
- CI pipeline fully functional
Phase 2 Complete
- 10 core components fully implemented
- Real performance benchmarks passing
- Accessibility tests with axe-core
- API contracts enforced
Phase 3 Complete
- Storybook/component catalog
- Semantic versioning automation
- Security scanning gates
- Cross-browser E2E tests
📊 Resource Estimation
- Total Effort: ~200-300 person hours
- Team Size: 2-3 senior engineers + 1 designer
- Timeline: 6-8 weeks for full production readiness
- Budget: $50k-75k in engineering time
🚦 Go/No-Go Decision
Current Recommendation: NO-GO for production use.
Path to Production:
- Complete Phase 1 fixes (critical)
- Implement 10 core components properly (Phase 2)
- Add comprehensive testing and documentation (Phase 3)
Next Steps
- Review individual remediation documents in this folder
- Prioritize Phase 1 critical fixes
- Assign ownership for each remediation item
- Set up weekly progress reviews
- Consider bringing in external audit team