Files
leptos-shadcn-ui/docs/implementation-plan.md

6.3 KiB

Complete Implementation Plan: Leptos shadcn/ui Completion

📋 Current Status Summary

Current Status:

  • Leptos: 47/51 components (92% coverage) Near Complete!
  • Target: 51/51 components (100% coverage) for Leptos framework

Updated Priority Matrix:

🎯 Leptos: Final 4 Components (92% → 100%)

  • avatar, data-table, chart, resizable, sidebar, sonner, typography

Completed Components (47/51)

Form & Input: checkbox, radio-group, select, combobox, form, date-picker, input-otp, slider, toggle, switch, input, label, textarea Navigation: navigation-menu, menubar, tabs, breadcrumb, command, context-menu, hover-card Overlay: dialog, alert-dialog, sheet, drawer, dropdown-menu, popover, tooltip, toast
Layout: accordion, collapsible, scroll-area, separator, aspect-ratio Display: calendar, carousel, progress, skeleton Advanced: pagination, table, button, card, alert, badge, utils

🎯 Implementation Phases

Phase 1: Foundation Enhancement (1-2 weeks) Infrastructure & Tooling

Week 1: Registry & Infrastructure

# Enhance component registry system
- Optimize registry_ui.rs with complete component definitions
- Implement dependency resolution system
- Add theme variant management
- Improve code generation pipeline

Week 2: Testing & Quality Infrastructure

# Enhance testing and quality systems
- Automated testing integration
- Component validation framework
- Performance benchmarking tools
- Documentation generation system

Deliverable: Robust foundation for rapid component development

Phase 2: Leptos Completion (2-3 weeks) 92% → 100%

Week 3-4: Final Components for Leptos

# Complete shadcn/ui spec for Leptos
- avatar: User profile image component
- data-table: Advanced table with sorting, filtering, pagination
- chart: Data visualization components  
- resizable: Resizable panel layout system
- sidebar: Navigation sidebar component
- sonner: Toast notification system (modern alternative)
- typography: Text styling and layout utilities

Deliverable: Leptos reaches 51/51 components (100% shadcn/ui coverage)

Phase 3: Advanced Features & Optimization (2-3 weeks)

Week 5-6: Advanced Features

# Enhanced functionality
- Advanced theme system
- Animation library integration
- Accessibility enhancements
- Performance optimizations

Week 7: Quality Assurance & Documentation

# Final polish and documentation
- Cross-browser testing suite
- Component documentation generation  
- Migration guide creation
- Performance benchmarking
- API consistency validation

Deliverable: Production-ready, fully-featured Leptos shadcn/ui ecosystem

🛠 Technical Implementation Strategy

Component Development Workflow

1. Component Scaffold Generation

// Template structure for each new component
src/
├── lib.rs          // Framework integration & public API
├── default.rs      // Default theme variant
├── new_york.rs     // New York theme variant  
├── types.rs        // Props and component types
└── tests.rs        // Unit tests

2. Registry Integration

// Add component to registry_ui.rs
RegistryEntry {
    name: "avatar".into(),
    r#type: RegistryItemType::Ui,
    description: Some("User profile image component".into()),
    dependencies: Some(vec!["web-sys".into()]),
    files: Some(vec![
        RegistryItemFile {
            path: "ui/avatar.rs".into(),
            r#type: RegistryItemType::Ui,
            target: None,
        }
    ]),
    category: Some("display".into()),
}

Quality Gates

Per-Component Checklist

  • Component implementation completed
  • Default and New York themes implemented
  • Props API consistency validated
  • Unit tests written and passing
  • Documentation generated
  • CLI integration tested
  • Cross-browser compatibility verified

Milestone Validation

  • Registry metadata complete and accurate
  • CLI commands functional for all components
  • Theme consistency across all components
  • Performance benchmarks within acceptable ranges

📊 Resource Requirements

Development Team Structure

  • Lead Architect: Registry and infrastructure design
  • Component Developer: Leptos component implementations
  • QA Engineer: Testing and validation
  • Technical Writer: Documentation and guides

Timeline Summary

  • Total Duration: 7 weeks
  • Major Milestones: 3 phases
  • Component Implementation: ~1 component/week average
  • Quality Gates: Built into each phase
  • Buffer Time: 15% contingency included

Success Metrics

  • Feature Parity: 51/51 components in Leptos framework
  • API Consistency: 100% consistent interfaces
  • Theme Accuracy: Visual parity with original shadcn/ui
  • Performance: WASM bundle size < 50KB per component
  • Developer Experience: < 5min component installation time

🎬 Implementation Commands

Phase 1 Commands

# Week 1: Infrastructure
cargo new packages/test-utils --lib
cargo new packages/component-generator --lib
# Update registry_ui.rs with complete component list

# Week 2: Quality Infrastructure
cargo test --workspace --verbose
cargo tarpaulin --workspace --out html

Phase 2 Commands

# Week 3-4: Final Components
rust-shadcn add avatar --framework leptos
rust-shadcn add data-table --framework leptos
rust-shadcn add chart --framework leptos
rust-shadcn add resizable --framework leptos
rust-shadcn add sidebar --framework leptos
rust-shadcn add sonner --framework leptos
rust-shadcn add typography --framework leptos

Testing Commands

# Run comprehensive test suite
cargo test --workspace
wasm-pack test --headless --firefox
npx playwright test

# Generate coverage reports
cargo tarpaulin --workspace --out html

Quality Assurance Commands

# Component validation
rust-shadcn validate --all-components
rust-shadcn test --coverage --visual-regression
rust-shadcn benchmark --performance

# Documentation generation
rust-shadcn docs generate --all-components
rust-shadcn docs validate --completeness

This focused plan provides a structured approach to achieving 100% Leptos shadcn/ui completion with systematic quality gates, testing strategies, and clear success criteria.