In `test_layer_download_cancelled_by_config_location`, we simulate hung
downloads via the `before-downloading-layer-stream-pausable` failpoint.
Then, we cancel a timeline via the `location_config` endpoint.
With the new default as of
https://github.com/neondatabase/neon/pull/11712, we would be creating
the timeline on safekeepers regardless if there have been writes or not,
and it turns out the test relied on the timeline not existing on
safekeepers, due to a cancellation bug:
* as established before, the test makes the read path hang
* the timeline cancellation function first cancels the walreceiver, and
only then cancels the timeline's token
* `WalIngest::new` is requesting a checkpoint, which hits the read path
* at cancellation time, we'd be hanging inside the read, not seeing the
cancellation of the walreceiver
* the test would time out due to the hang
This is probably also reproducible in the wild when there is S3
unavailabilies or bottlenecks. So we thought that it's worthwhile to fix
the hang issue. The approach chosen in the end involves the
`tokio::select` macro.
In PR 11712, we originally punted on the test due to the hang and opted
it out from the new default, but now we can use the new default.
Part of https://github.com/neondatabase/neon/issues/12299
pgaudit can spam logs due to all the monitoring that we do. Logs from
these connections are not necessary for HIPPA compliance, so we can stop
logging from those connections.
Part-of: https://github.com/neondatabase/cloud/issues/29574
Signed-off-by: Tristan Partin <tristan@neon.tech>
This makes it possible for the compiler to validate that a match block
matched all PostgreSQL versions we support.
## Problem
We did not have a complete picture about which places we had to test
against PG versions, and what format these versions were: The full PG
version ID format (Major/minor/bugfix `MMmmbb`) as transfered in
protocol messages, or only the Major release version (`MM`). This meant
type confusion was rampant.
With this change, it becomes easier to develop new version-dependent
features, by making type and niche confusion impossible.
## Summary of changes
Every use of `pg_version` is now typed as either `PgVersionId` (u32,
valued in decimal `MMmmbb`) or PgMajorVersion (an enum, with a value for
every major version we support, serialized and stored like a u32 with
the value of that major version)
---------
Co-authored-by: Arpad Müller <arpad-m@users.noreply.github.com>
## Problem
`Attached(0)` tenant migrations can get stuck if the heatmap file has
not been uploaded.
## Summary of Changes
- Added a test to reproduce the issue.
- Introduced a `kick_secondary_downloads` config flag:
- Enabled in testing environments.
- Disabled in production (and in the new test).
- Updated `Attached(0)` locations to consider the number of secondaries
in their intent when deciding whether to download the heatmap.
## Problem
Part of #11813
## Summary of changes
Add a test API to make it easier to manipulate the feature flags within
tests.
---------
Signed-off-by: Alex Chi Z <chi@neon.tech>
The `--gzip-probability` parameter was removed in #12250. However,
`test_basebackup_with_high_slru_count` still uses it, and keeps failing.
This patch removes the use of the parameter (gzip is enabled by
default).
Enable it across tests and set it as default. Marks the first milestone
of https://github.com/neondatabase/neon/issues/9114. We already enabled
it in all AWS regions and planning to enable it in all Azure regions
next week.
will merge after we roll out in all regions.
---------
Signed-off-by: Alex Chi Z <chi@neon.tech>
## Problem
`test_runner` integration tests should support gRPC.
Touches #11926.
## Summary of changes
* Enable gRPC for Pageservers, with dynamic port allocations.
* Add a `grpc` parameter for endpoint creation, plumbed through to
`neon_local endpoint create`.
No tests actually use gRPC yet, since computes don't support it yet.
## Problem
`test_sharding_failures` is flaky due to interference from the
`background_reconcile` process.
The details are in the issue
https://github.com/neondatabase/neon/issues/12029.
## Summary of changes
- Use `reconcile_until_idle` to ensure a stable state before running
test assertions
- Added error tolerance in `reconcile_until_idle` test function (Failure
cases: 1, 3, 19, 20)
- Ignore the `Keeping extra secondaries` warning message since it i
retryable (Failure case: 2)
- Deduplicated code in `assert_rolled_back` and `assert_split_done`
- Added a log message before printing plenty of Node `X` seen on
pageserver `Y`
## Problem
- We run the large tenant oltp workload with a fixed size (larger than
existing customers' workloads).
Our customer's workloads are continuously growing and our testing should
stay ahead of the customers' production workloads.
- we want to touch all tables in the tenant's database (updates) so that
we simulate a continuous change in layer files like in a real production
workload
- our current oltp benchmark uses a mixture of read and write
transactions, however we also want a separate test run with read-only
transactions only
## Summary of changes
- modify the existing workload to have a separate run with pgbench
custom scripts that are read-only
- create a new workload that
- grows all large tables in each run (for the reuse branch in the large
oltp tenant's project)
- updates a percentage of rows in all large tables in each run (to
enforce table bloat and auto-vacuum runs and layer rebuild in
pageservers
Each run of the new workflow increases the logical database size about
16 GB.
We start with 6 runs per day which will give us about 96-100 GB growth
per day.
---------
Co-authored-by: Alexander Lakhin <alexander.lakhin@neon.tech>
- Add optional `?mode=fast|immediate` to `/terminate`, `fast` is
default. Immediate avoids waiting 30
seconds before returning from `terminate`.
- Add `TerminateMode` to `ComputeStatus::TerminationPending`
- Use `/terminate?mode=immediate` in `neon_local` instead of `pg_ctl
stop` for `test_replica_promotes`.
- Change `test_replica_promotes` to check returned LSN
- Annotate `finish_sync_safekeepers` as `noreturn`.
https://github.com/neondatabase/cloud/issues/29807
This check API only cheks the safekeeper_connstrings at the moment, and
the validation is limited to checking we have at least one entry in
there, and no duplicates.
## Problem
If the compute_ctl service is started with an empty list of safekeepers,
then hard-to-debug errors may happen at runtime, where it would be much
easier to catch them early.
## Summary of changes
Add an entry point in the compute_ctl API to validate the configuration
for safekeeper_connstrings.
---------
Co-authored-by: Heikki Linnakangas <heikki@neon.tech>
## Problem
https://github.com/neondatabase/neon/issues/7570
Even triggers are supported only for superusers.
## Summary of changes
Temporary switch to superuser when even trigger is created and disable
execution of user's even triggers under superuser.
---------
Co-authored-by: Dimitri Fontaine <dim@tapoueh.org>
Co-authored-by: Konstantin Knizhnik <knizhnik@neon.tech>
## Problem
Compatibility tests may be run against a compatibility snapshot
generated with --timelines-onto-safekeepers=false. We need to start the
compute without a generation (or with 0 generation) if the timeline is
not storcon-managed, otherwise the compute will hang.
- Follow up on https://github.com/neondatabase/neon/pull/12203
- Relates to https://github.com/neondatabase/neon/pull/11712
## Summary of changes
- Handle compatibility snapshot generated with no
`--timelines-onot-safekeepers` properly
## Problem
The cache was introduced as a hackathon project and the only supported
limit was the number of entries.
The basebackup entry size may vary. We need to have more control over
disk space usage to ship it to production.
- Part of https://github.com/neondatabase/cloud/issues/29353
## Summary of changes
- Store the size of entries in the cache and use it to limit
`max_total_size_bytes`
- Add the size of the cache in bytes to metrics.
## Problem
We don't test debug builds for v14..v16 in the regular "Build and Test"
runs to perform the testing faster, but it means we can't detect
assertion failures in those versions.
(See https://github.com/neondatabase/neon/issues/11891,
https://github.com/neondatabase/neon/issues/11997)
## Summary of changes
Add a new workflow to test all build types and all versions on all
architectures.
## Problem
`test_historic_storage_formats` uses `/tenant_import` to import historic
data. Tenant import does not create timelines onto safekeepers, because
they might already exist on some safekeeper set. If it does, then we may
end up with two different quorums accepting WAL for the same timeline.
If the tenant import is used in a real deployment, the administrator is
responsible for looking for the proper safekeeper set and migrate
timelines into storcon-managed timelines.
- Relates to https://github.com/neondatabase/neon/pull/11712
## Summary of changes
- Create timelines onto safekeepers manually after tenant import in
`test_historic_storage_formats`
- Add a note to tenant import that timelines will be not storcon-managed
after the import.
## Problem
The test creates an endpoint and deletes its tenant. The compute cannot
stop gracefully because it tries to write a checkpoint shutdown record
into the WAL, but the timeline had been already deleted from
safekeepers.
- Relates to https://github.com/neondatabase/neon/pull/11712
## Summary of changes
Stop the compute before deleting a tenant
## Problem
Compatibility tests may be run against a compatibility snapshot
generated with `--timelines-onto-safekeepers=false`. We need to start
the compute without a generation (or with 0 generation) if the timeline
is not storcon-managed, otherwise the compute will hang.
This handler is needed to check if the timeline is storcon-managed.
It's also needed for better test coverage of safekeeper migration code.
- Relates to https://github.com/neondatabase/neon/pull/11712
## Summary of changes
- Implement `tenant_timeline_locate` handler in storcon to get
safekeeper info from storcon's DB
## Problem
The project limits were not respected, resulting in errors.
## Summary of changes
Now limits are checked before running an action, and if the action is
not possible to run, another random action will be run.
---------
Co-authored-by: Peter Bendel <peterbendel@neon.tech>
## Problem
Looks like our sql-over-http tests get to rely on "trust"
authentication, so the path that made sure the authkeys data was set was
never being hit.
## Summary of changes
Slight refactor to WakeComputeBackends, as well as making sure auth keys
are propagated. Fix tests to ensure passwords are tested.
## Problem
If a shard split fails and must roll back, the tenant may hit a cold
start as the parent shard's files have already been removed from local
disk.
External contribution with minor adjustments, see
https://neondb.slack.com/archives/C08TE3203RQ/p1748246398269309.
## Summary of changes
Keep the parent shard's files on local disk until the split has been
committed, such that they are available if the spilt is rolled back. If
all else fails, the files will be removed on the next Pageserver
restart.
This should also be fine in a mixed version:
* New storcon, old Pageserver: the Pageserver will delete the files
during the split, storcon will log an error when the cleanup detach
fails.
* Old storcon, new Pageserver: the Pageserver will leave the parent's
files around until the next Pageserver restart.
The change looks good to me, but shard splits are delicate so I'd like
some extra eyes on this.
We might delete timelines on safekeepers before we are deleting them on
pageservers. This should be an exceptional situation, but can occur. As
the first step to improve behaviour here, emit a special error that is
less scary/obscure than "was not found in global map".
It is for example emitted when the pageserver tries to run
`IDENTIFY_SYSTEM` on a timeline that has been deleted on the safekeeper.
Found when analyzing the failure of
`test_scrubber_physical_gc_timeline_deletion` when enabling
`--timelines-onto-safekeepers` on the pytests.
Due to safekeeper restarts, there is no hard guarantee that we will keep
issuing this error, so we need to think of something better if we start
encountering this in staging/prod. But I would say that the introduction
of `--timelines-onto-safekeepers` in the pytests and into staging won't
change much about this: we are already deleting timelines from there. In
`test_scrubber_physical_gc_timeline_deletion`, we'd just be leaking the
timeline before on the safekeepers.
Part of #11712
## Problem
Removed nodes can re-add themselves on restart if not properly
tombstoned. We need a mechanism (e.g. soft-delete flag) to prevent this,
especially in cases where the node is unreachable.
More details there: #12036
## Summary of changes
- Introduced `NodeLifecycle` enum to represent node lifecycle states.
- Added a string representation of `NodeLifecycle` to the `nodes` table.
- Implemented node removal using a tombstone mechanism.
- Introduced `/debug/v1/tombstone*` handlers to manage the tombstone
state.
neon_local's timeline import subcommand creates timelines manually, but
doesn't create them on the safekeepers. If a test then tries to open an
endpoint to read from the timeline, it will error in the new world with
`--timelines-onto-safekeepers`.
Therefore, if that flag is enabled, create the timelines on the
safekeepers.
Note that this import functionality is different from the fast import
feature (https://github.com/neondatabase/neon/issues/10188, #11801).
Part of #11670
As well as part of #11712
## Problem
- `test_basebackup_cache` fails in
https://github.com/neondatabase/neon/pull/11712 because after the
timelines on safekeepers are managed by storage controller, they do
contain proper start_lsn and the compute_ctl tool sends the first
basebackup request with this LSN.
- `Failed to prepare basebackup` log messages during timeline
initialization, because the timeline is not yet in the global timeline
map.
- Relates to https://github.com/neondatabase/cloud/issues/29353
## Summary of changes
- Account for `timeline_onto_safekeepers` storcon's option in the test.
- Do not trigger basebackup prepare during the timeline initialization.
## Problem
We support two ingest protocols on the pageserver: vanilla and
interpreted.
Interpreted has been the only protocol in use for a long time.
## Summary of changes
* Remove the ingest handling of the vanilla protocol
* Remove tenant and pageserver configuration for it
* Update all tests that tweaked the ingest protocol
## Compatibility
Backward compatibility:
* The new pageserver version can read the existing pageserver
configuration and it will ignore the unknown field.
* When the tenant config is read from the storcon db or from the
pageserver disk, the extra field will be ignored.
Forward compatiblity:
* Both the pageserver config and the tenant config map missing fields to
their default value.
I'm not aware of any tenant level override that was made for this knob.
## Problem
It will be useful to understand what kind of queries our clients are
executed.
And one of the most important characteristic of query is query execution
time - at least it allows to distinguish OLAP and OLTP queries. Also
monitoring query execution time can help to detect problem with
performance (assuming that workload is more or less stable).
## Summary of changes
Add query execution time histogram.
---------
Co-authored-by: Konstantin Knizhnik <knizhnik@neon.tech>
Url::to_string() adds a trailing slash on the base URL, so when we did
the format!(), we were adding a double forward slash.
Signed-off-by: Tristan Partin <tristan@neon.tech>
## Problem
We want to repro an OOM situation, but large partial reads are required.
## Summary of Changes
Make the max partial read size configurable for import jobs.
## Problem
I noticed a small percentage of flakes on some import tests.
They were all instances of the storage controller being too eager on the
finalization.
As a refresher: the pageserver notifies the storage controller that it's
done from the import task
and the storage controller has to call back into it in order to finalize
the import. The pageserver
checks that the import task is done before serving that request. Hence,
we can get this race.
In practice, this has no impact since the storage controller will simply
retry.
## Summary of changes
Allow list such cases
## Problem
Checking the most recent state of pageservers was insufficient to
evaluate whether another pageserver may read in a particular generation,
since the latest state might mask some earlier AttachedSingle state.
Related: https://github.com/neondatabase/neon/issues/11348
## Summary of changes
- Maintain a history of all attachments
- Write out explicit rules for when a pageserver may read
## Problem
Disk usage eviction isn't sensitive to layers of imported timelines.
## Summary of changes
Hook importing timelines up into eviction and add a test for it.
I don't think we need any special eviction logic for this. These layers
will all be visible and
their access time will be their creation time. Hence, we'll remove
covered layers first
and get to the imported layers if there's still disk pressure.
## Problem
Importing timelines can't currently be deleted. This is problematic
because:
1. Cplane cannot delete failed imports and we leave the timeline behind.
2. The flow does not support user driven cancellation of the import
## Summary of changes
On the pageserver: I've taken the path of least resistance, extended
`TimelineOrOffloaded`
with a new variant and added handling in the right places. I'm open to
thoughts here,
but I think it turned out better than I was envisioning.
On the storage controller: Again, fairly simple business: when a DELETE
timeline request is
received, we remove the import from the DB and stop any finalization
tasks/futures. In order
to stop finalizations, we track them in-memory. For each finalizing
import, we associate a gate
and a cancellation token.
Note that we delete the entry from the database before cancelling any
finalizations. This is such
that a concurrent request can't progress the import into finalize state
and race with the deletion.
This concern about deleting an import with on-going finalization is
theoretical in the near future.
We are only going to delete importing timelines after the storage
controller reports the failure to
cplane. Alas, the design works for user driven cancellation too.
Closes https://github.com/neondatabase/neon/issues/11897
The `test_storcon_create_delete_sk_down` test is still flaky. This test
addresses two possible causes for flakiness. both causes are related to
deletion racing with `pull_timeline` which hasn't finished yet.
* the first cause is timeline deletion racing with `pull_timeline`:
* the first deletion attempt doesn't contain the line because the
timeline doesn't exist yet
* the subsequent deletion attempts don't contain it either, only a note
that the timeline is already deleted.
* so this patch adds the note that the timeline is already deleted to
the regex
* the second cause is about tenant deletion racing with `pull_timeline`:
* there were no tenant specific tombstones so if a tenant was deleted,
we only added tombstones for the specific timelines being deleted, not
for the tenant itself.
* This patch changes this, so we now have tenant specific tombstones as
well as timeline specific ones, and creation of a timeline checks both.
* we also don't see any retries of the tenant deletion in the logs. once
it's done it's done. so extend the regex to contain the tenant deletion
message as well.
One could wonder why the regex and why not using the API to check
whether the timeline is just "gone". The issue with the API is that it
doesn't allow one to distinguish between "deleted" and "has never
existed", and latter case might race with `pull_timeline`. I.e. the
second case flakiness helped in the discovery of a real bug (no tenant
tombstones), so the more precise check was helpful.
Before, I could easily reproduce 2-9 occurences of flakiness when
running the test with an additional `range(128)` parameter (i.e. 218
times 4 times). With this patch, I ran it three times, not a single
failure.
Fixes#11838
## Problem
Previous attempt https://github.com/neondatabase/neon/pull/10548 caused
some issues in staging and we reverted it. This is a re-attempt to
address https://github.com/neondatabase/neon/issues/11063.
Currently we create image layers at latest record LSN. We would create
"future image layers" (i.e., image layers with LSN larger than disk
consistent LSN) that need special handling at startup. We also waste a
lot of read operations to reconstruct from L0 layers while we could have
compacted all of the L0 layers and operate on a flat level of historic
layers.
## Summary of changes
* Run repartition at L0-L1 boundary.
* Roll out with feature flags.
* Piggyback a change that downgrades "image layer creating below
gc_cutoff" to debug level.
---------
Signed-off-by: Alex Chi Z <chi@neon.tech>
Some tests still explicitly specify version 3 of the safekeeper
walproposer protocol. Remove the explicit opt in from the tests as v3 is
the default now since #11518.
We don't touch the places where a test exercises both v2 and v3. Those
we leave for #12021.
Part of https://github.com/neondatabase/neon/issues/10326