Neil ec9f35e2ee perf(ci): plan the unit shards before the static-analysis gate instead of behind it (#23743)
A caller's `needs` gate the whole called workflow, so while the plan job lived in
unit-tests.yml it could not start until static analysis and typecheck had both
finished and passed -- and the shard matrix then waited on it. The two hops were
serial when they did not need to be: planning reads the checkout, a git diff
against HEAD^1, the import graph and the checked-in timing baseline in
config/scripts/ci-shard-timings.json, and consumes nothing that static analysis,
typecheck or the native-cache primer produce.

Planning moves to its own reusable workflow so pr.yml can run it against
code_paths alone, overlapping it with the gate. Measured across 99 runs, the
shard matrix is created a median 93s earlier (p25 47s, p90 241s, never later).
Planning stays a required predecessor of the shards, so an empty assignment
cannot expand the matrix.

The gate itself is deliberately left in place. It fires on 22% of runs, and the
shard queue wait knees hard above ~9 concurrent ARM jobs -- 4s median below that
against 218s at 15-19 -- so admitting 8 doomed shards per failed run would cost
more in queue pressure than it returns in latency.

Cost is one 37s ubuntu-latest job, which does not touch the ARM pool the shards
contend for.

A planning failure still fails the PR: the shards are skipped, and verify's
check_job requires success whenever the classifier says tests should run, so it
reports `test: expected success, got skipped`.
2026-09-28 19:22:10 -07:00
..