mirror of
https://github.com/stablyai/orca.git
synced 2026-09-30 16:02:56 +00:00
A caller's `needs` gate the whole called workflow, so while the plan job lived in unit-tests.yml it could not start until static analysis and typecheck had both finished and passed -- and the shard matrix then waited on it. The two hops were serial when they did not need to be: planning reads the checkout, a git diff against HEAD^1, the import graph and the checked-in timing baseline in config/scripts/ci-shard-timings.json, and consumes nothing that static analysis, typecheck or the native-cache primer produce. Planning moves to its own reusable workflow so pr.yml can run it against code_paths alone, overlapping it with the gate. Measured across 99 runs, the shard matrix is created a median 93s earlier (p25 47s, p90 241s, never later). Planning stays a required predecessor of the shards, so an empty assignment cannot expand the matrix. The gate itself is deliberately left in place. It fires on 22% of runs, and the shard queue wait knees hard above ~9 concurrent ARM jobs -- 4s median below that against 218s at 15-19 -- so admitting 8 doomed shards per failed run would cost more in queue pressure than it returns in latency. Cost is one 37s ubuntu-latest job, which does not touch the ARM pool the shards contend for. A planning failure still fails the PR: the shards are skipped, and verify's check_job requires success whenever the classifier says tests should run, so it reports `test: expected success, got skipped`.